Services
Roof renovation in Nieuwegein by an all-round builder
Roof renovation, roof extensions and dormers out of Nieuwegein. Roofing as building work by one tradesman, not a roofing firm.
I am Dido Siderov and I do roof work that ties into the rest of the house. A roof renovation with tiles, roof boarding and insulation, a roof extension or a dormer, and the roof of an extension I am building anyway. I am not a roofing firm, so bitumen on a big flat roof and asbestos I leave to somebody else.
What I do for you
I work in Nieuwegein and Utrecht, and for a bigger job further out into the region.
How I go about it
- Relaying, topping up or replacing roof tiles
- Renewing battens and counter battens on a roof that is open anyway
- Repairing roof boarding and dealing with wood rot
- Insulating at the moment the structure is open
- Fitting or replacing a dormer, including the finish inside
- A roof extension as building work, with a structural engineer where needed
- Cladding the cheeks and fascia boards of a dormer
- The roof of an extension or annexe in the same hands
A roof is not a separate trade to me, it is the top part of the house I am already working on. I am Dido Siderov, an all-round builder from Nieuwegein, and I pick up roof work that ties into the rest of the job. A roof renovation where the tiles come off and the roof boarding and the insulation go along with it. A roof extension or a dormer that turns a loft into a room. The roof of an extension I am building anyway. What I am not is a roofing firm with a crew, a call-out service and its own scaffolder. I say that difference straight away, because it decides whether you are in the right place with me.
What I do and do not do on a roof
I work on my own. That means roof work with me is building work: timber, insulation, tiles, junctions and the finish underneath. It also means there are roof jobs I keep away from, because they ask for plant or a specialism I do not have.
What I take on
A roof renovation on a pitched tiled roof, from the tiles coming off to everything closed again. Replacing loose or cracked tiles and putting a roof surface that has shifted back in order. Repairing roof boarding and dealing with wood rot. Insulating at the moment the structure lies open anyway. Fitting or replacing a dormer, including the carpentry, the cladding and the finish on the inside. A roof extension as building work. And the roof of an extension or annexe, as part of that job.
What I do not take on
- Torching bitumen on a big flat roof. That is a roofer’s trade.
- Thatch and slate. Different trade, different man.
- Asbestos corrugated sheets or old roofing felt. That belongs with a certified asbestos removal firm.
- Acute emergency work on a leak. I stand on the job myself and have no out-of-hours service.
- Roofs of apartment blocks and industrial units with several crews on them.
- Solar panels and the wiring that goes with them.
If I say no, you hear why and usually also who does do it. That costs me a job and it saves you a quote you have nothing to do with.
Roof renovation: tiles, roof boarding and insulation
A roof renovation is hardly ever just a roof. As soon as the tiles are off, the whole top of the house lies open, and that is the only moment you can get at it cheaply. So I always ask the same question before I make a quote: what do you want to do with this loft in a few years. If it stays storage, the answer is different from when a bedroom has to go in.
Roof tiles
On a re-tiling job the tiles come off, I check the battens and counter battens and I lay the roof surface again. Sometimes the existing tiles can go back and it is purely about the timber underneath. More often it is mixed: part of the tiles are cracked or weathered and have to be topped up.
That topping up is the point where it goes wrong if you do not look at it up front. An old tile is not always still available, and a tile that is only slightly different stands out when it sits among the rest on one surface. So I first look at whether matching is realistic, and if it is not, the honest answer is that the whole surface gets renewed. That is dearer, and you hear it from me before the ladder goes against the gutter, not after.
Roof boarding and wood rot
The roof boarding is the part you only really see once the tiles are gone. From the loft you can judge damp patches and discolouring, but the spots by the gutter and around a chimney stay an estimate. So my quote says what I can see, and separately what happens if the timber turns out worse.
I deal with wood rot by taking the affected part out back to sound timber and building it up again. Hiding it behind new boarding is not an option. The damp that caused it is still there, and then you are standing in the same spot in a few years.
Insulation
Insulating can be done from the outside, with the tiles off, or from the inside between and under the rafters. From the outside is the better job structurally: you keep your loft height and the layer runs through without breaks. From the inside the work is smaller and the roof does not have to come open, but you give up height and the junctions at the gutter and the ridge take more care to get airtight.
Which of the two it becomes hangs mostly on the rest of your plans. If it is going to be a proper room, this sits straight onto a full renovation of the upper floor, including walls, floor and wiring. Then the insulation is not a separate item but the first step.
Roof extension and dormer
A roof extension and a dormer do the same thing: turn a loft into usable space. They differ in how heavy the work is.
A dormer is an extension in the roof surface. You win headroom and light in one place, and the work is manageable. With a roof extension you change the shape of the roof itself, and then you are nearly always at the structure. A structural engineer comes into it, and usually a permit too. I supply the structural backing, the application runs in the owner’s name.
What I do in both cases is keep the whole run on one side. The opening in the roof, the frame, the cheeks, the junction with the roof surface, the insulation, and after that the inside: plastering, window sill and trim. If there is custom carpentry under the sloped ceiling in the plans as well, that is the same job and not a second party turning up after me.
Facade cladding on a dormer
The cheeks and fascia boards of a dormer are one of the few places where cladding really changes the look of a house. A dormer sits high, catches all the weather and is the first thing you see from the street. If there is weathered sheet material on it, that pulls your whole front elevation down.
I pick this up as part of the roof work or as a separate job. Timber gives a warmer look and asks for maintenance. Composite facade cladding costs more to buy and asks little afterwards, which on a spot you can never get at easily weighs heavier than on a shed in the garden. Which way you want to go decides the choice, and what else is possible is on the page about facade cladding.
The roof of an extension
If I build an extension or an annexe, the roof of it belongs to that job. That is usually a flat roof on a manageable span, with the junction to the existing wall as the point it comes down to. That junction is the place where it leaks later if it is not right, and it is exactly the seam where you do not want two builders pointing at each other. More about how a build like that runs with me is on extensions and annexes.
Where I work
Nieuwegein is my base, and the area right around it is where I am on site quickest. On top of that I work in the rest of the region, including Utrecht. For roof work I always take a look at the access, because it drives the planning more than it does on inside work. If the van can stand nearby and a ladder or a small scaffold fits, it is a normal job. If plant has to come that blocks the street, we discuss that before it goes in the quote.
Straight about this page
Roof work is a recent addition to what I offer. There is no roof project in my portfolio at the moment, and I am not putting a photo with it that does not belong there. What there is: over twenty years in construction, and the choice to take on only what I can also finish on my own.
If you are after a firm that turns up with a crew tomorrow and replaces your whole roof, I am not it. If you are after someone who takes the roof along in the work underneath, who says what he does not do, and who is the same man who finishes your loft afterwards, then it fits. Send a few photos of your roof and of the loft from the inside through the contact page, and I will tell you up front whether this work is for me.
What sets the price
On roof work the uncertainty is nearly always under the tiles. While they are still on I can only judge the roof boarding from the inside, and that does not tell you everything. So I quote for the work I can see, and set out separately what happens if the timber turns out worse. That way you know up front which item can grow, instead of getting a bill halfway through that you did not see coming. What else drives the price is the access and whether the roof has to come open. Taking a dormer or insulation along at the moment the tiles are off anyway is always cheaper than doing it separately, and that is usually the conversation we have at the visit.
What it comes down to
- Whether the roof has to come open or the work can be done from the inside
- The state of the roof boarding and the battens, and you only see that once the tiles are off
- Whether a ladder is enough or a scaffold or a cherry picker has to come
- Whether insulation goes in and how thick that layer becomes
- The type of tile and whether the same tile can still be matched on an existing roof
- On a dormer, the width, the type of frame and the finish inside
- Whether the structure changes and a structural engineer and a permit come into it
- Taking the old material away
What is included
- Measuring up on the job and a quote that says what I do and what I supply
- Strip-out and removal of the material listed in the quote
- The carpentry, so roof boarding, battens, counter battens and trim
- Fitting and weathertight detailing of what I supply
- Fitting insulation if it is in the order
- The inside finish of a dormer or loft if that has been included
- Leaving it clean and walking the work through with you
What comes on top
- The structural calculation and the permit application itself
- Scaffold or cherry picker, which goes separately in the quote as soon as it turns out to be needed
- Removing asbestos, that is work for a certified asbestos removal firm
- Solar panels and the wiring that goes with them
- Bitumen work on a big flat roof
- Damage that only shows up once the tiles are off
Send a few photos of the situation and say briefly what you want. Then you hear from me what it will cost in your case, itemised and with no strings attached.
Also in these towns
I work out of Nieuwegein and come to the whole region. These are the towns with a page of their own.
Frequently asked questions
Are you a roofer?
No. I am an all-round builder who does roof work as building work. Timber, insulation, tiles, junctions and the finish underneath. For bitumen work on a big flat roof, for thatch or slate and for asbestos you need a specialist firm. I would rather say that straight away than have you find out halfway through.
Do you do emergency repairs on a leak?
I have no call-out service and I am usually standing on another job, so I am not the man you ring at night. If the leak sits in the timber or around a dormer and it can wait until I come by, I will have a look. For acute water damage, ring a roofer with an out-of-hours service.
Can you fit a dormer and finish it on the inside as well?
Yes, and that is exactly the reason to put it with one man. The opening, the frame, the cheeks, the junction with the roof surface, the insulation, and after that the plastering, the window sill and the trim on the inside. You then do not need a second party to sort out the mess left by the first.
Do I need a permit for a roof extension or a dormer?
That depends on your council, on the spot on the roof and on whether you live in a protected townscape. A dormer at the back comes out permit-free more often than one at the front, but do not count on that blindly. I think it through with you up front and supply the structural backing. The application runs in the owner's name, so you file it yourself.
Can you insulate without taking the whole roof off?
Often you can, from the inside between and under the rafters. You give up some height in your loft that way, and the junction at the gutter and the ridge is harder to get airtight. If the tiles are coming off for a renovation anyway, that is the cheapest moment to do it from the outside. That is exactly why I ask what you want to do with that loft in a few years.
Can you clad a dormer so it matches the facade?
Yes. The cheeks and the fascia boards of a dormer are one of the few places where cladding really changes the look of a house. Timber or composite, both possible, with a difference in maintenance that I go through with you up front.
Do you only work in Nieuwegein?
Nieuwegein is my base, but I work across the whole Utrecht region. For roof work I do look at the access. If the van can stand at the door and a ladder or a small scaffold fits, it is a normal job. If a street has to be closed off, that is a conversation up front.
What customers say about this work
“I am really happy with how Dido carried out the work. I had a leak and a mould problem at my kitchen sink. He replaced the tap and the basin and parts of the plumbing. The result turned out really nicely. Dido knows his trade very well and is very solution-minded. I will definitely hire him again for other jobs.”
Translated from Dutch
“I am really happy with how Dido carried out the work. I had a leak and a mould problem at my kitchen sink. He replaced the tap and the basin and parts of the plumbing. The result turned out really nicely. Dido knows his trade very well and is very solution-minded. I will definitely hire him again for other jobs.”
Translated from Dutch
“An honest businessman who is happy to think along with you. During the renovation he also helped with other small things he hadn't come for. Recommended”
Translated from Dutch
Tell me briefly what is going on
Three short steps. I look at it and call you back to talk it through.
1/3
Sent
Thanks, I have got it
I am on the tools myself, so it can take a few hours before I reply. If you are in a hurry, feel free to call.
Call me: 06 27 74 57 05Want this job done?
Tell me briefly what is going on. I talk the approach through with you and give you a price you can build on.
Need this too?
I do more than just this. Feel free to combine jobs in one visit.
- RenovationOne room, one floor or the whole house. One point of contact from start to finish.View this service
- Commercial & hospitalityRestaurants, bars and commercial spaces. Every day you are shut costs you money, so I plan the work around that.View this service
- Carpentry & fittingFurniture, dressing rooms, fitted wardrobes and assembly. Built to measure so it fits exactly where it has to.View this service
- Bathroom & sanitaryA complete new bathroom, or just the tap, shower or toilet. From strip-out to the last bead of sealant.View this service
- Floors & tilesFloors and tiling laid tight, from living room to hallway. Straight, level and finished neatly.View this service
- Garden & landscapingLayout, paving, trees and planting. With 7 years of agronomy (the science of soil and crops) I know the ground and the plants that grow in it.View this service
- Handyman & maintenanceThat list of small jobs you keep putting off. Get it ready and I work through it in one visit.View this service
- Facade claddingNew exterior facade cladding in wood, composite, plastic or brick slips, on a batten frame that lets the wall breathe.View this service
- Extensions and annexesExtra room without moving house, built on site from the foundation to the skirting board.View this service